Skip to content
Old fuses in the meter box? Fixed-price switchboard upgrades, usually done in a day →
Joondalup Electrical, Electrical & Air Conditioning

Licensed WA Electrician · EC9674

EV Charger Installation in Perth's North Done Properly, Fixed Price

A home EV charger is only as good as the switchboard behind it. Glen checks your board's load capacity first, tells you exactly what your home needs, and gives you one fixed price before any work starts.

25+ years experience Fixed-price quotes Licensed & insured (EC9674) Family-owned & local Load assessment included

Check the board first

Bought an EV? Your Switchboard Gets a Say First

Most Joondalup homes were wired decades before anyone imagined plugging a car into the garage wall. A home EV charger is one of the biggest single loads you can add to a house, bigger than an oven and bigger than most air conditioners, and an older board with ceramic fuses or limited spare capacity may not handle it safely.

That's why JEC never quotes an EV charger install sight unseen. Glen checks your switchboard's load capacity first. If the board is up to it, you get one fixed price for the charger install. If it needs upgrading, you'll know before any money changes hands, and we can do both jobs together, so you're not paying two call-outs. See our switchboard upgrades page for what that involves.

Either way, you get a straight answer and a written fixed price, never a mid-job surprise.

What we do

EV Charger Installation Across Joondalup & the Northern Suburbs

JEC installs home EV chargers in Joondalup homes and across Perth's northern corridor: Currambine, Kinross, Clarkson, Edgewater, Wanneroo and surrounds. Every install includes:

  • Switchboard load assessment: we confirm your board can carry the charger before quoting, and flag a switchboard upgrade if one's needed first
  • Dedicated circuit installation: your charger runs on its own protected circuit with its own RCD, not shared with the garage power points
  • Wall-mounted charger supply and install: we can supply the charger, or install a charger you've already purchased
  • Single-phase or three-phase installation: matched to your home's supply and how fast you actually need to charge
  • Cable run and tidy finish: cabling clipped, concealed where practical, and the work area left clean
  • Safety certificate: the install is tested, compliant, and signed off for your records

Single-phase or three-phase, the simple version. Most Perth homes have single-phase power, which runs a 7 kW charger: plenty for overnight charging, typically adding a few hundred kilometres of range while you sleep. Three-phase supply allows a faster 22 kW-capable charger, but most drivers never need it at home. Glen will tell you which one your house has and whether upgrading is worth it for you. Usually it isn't.

A myenergi Zappi home EV charger installation by JEC on a cream brick garage wall, its black charging cable coiled around the unit with the connector docked, white conduit running up each side to the ceiling and an isolator beside it.

Which charger

Single-Phase or Three-Phase? What Most Homes Need

  • Charging speed

    Three-phase (22 kW)

    Up to ~22 kW, fastest top-up

    Single-phase (7 kW)

    Around 7 kW, fully charges most EVs overnight

  • Your home's supply

    Three-phase (22 kW)

    Needs a three-phase supply, which many Perth homes do not have

    Single-phase (7 kW)

    Works with the single-phase supply most Perth homes already have

  • Typical cost

    Three-phase (22 kW)

    Higher, and may need a supply upgrade first

    Single-phase (7 kW)

    Lower, usually no supply upgrade needed

  • Best for

    Three-phase (22 kW)

    Very high daily kilometres or two EVs charging fast

    Single-phase (7 kW)

    The large majority of households

Glen confirms what supply your home has during the assessment, then recommends the charger that actually suits your driving. No upsell to three-phase you do not need.

Why JEC

Why Joondalup Homeowners Get JEC to Do It

The switchboard comes first

Plenty of installers bolt a charger to the wall and leave. Glen assesses your board's capacity before quoting, because an overloaded board is a problem you'd rather find before the install, not after. If it needs work, switchboard upgrades are the job Glen does most.

One fixed price, in writing

You'll know your exact number before any work starts: charger, circuit, cabling, testing, the lot. No hourly rate, no "while we're in there" add-ons.

A local sparky, not a booking platform

You deal with Glen directly, from quote to sign-off. Family-owned, based in Joondalup, 25+ years working on homes like yours.

From Quote to First Charge: Three Steps

  1. Home assessment

    Glen visits, checks your switchboard's load capacity and where the charger should go, and talks through single-phase vs three-phase for your driving.

  2. Fixed-price quote

    You get one written fixed price, for the charger install alone or bundled with a switchboard upgrade if your board needs one first.

  3. Install and handover

    The charger is mounted, wired on its own protected circuit, tested and certified. Glen shows you how it works before he leaves, and the area is left tidy.

EV Charger Installation Questions, Answered

How much does EV charger installation cost in Joondalup?

The price depends on three things: the charger itself, the cable run from your switchboard to the charging spot, and whether your board needs upgrading first. JEC gives you one fixed price in writing after a home assessment. The number you're quoted is the number you pay.

Do I need a switchboard upgrade before installing an EV charger?

Often, yes, especially in homes built before the 1990s. An EV charger draws more sustained load than most household appliances, and older boards with ceramic fuses or no spare capacity can't carry it safely. Glen checks this as part of every quote, and if an upgrade is needed we price both jobs together. Details on our switchboard upgrades page.

Should I get a single-phase or three-phase charger?

Most Perth homes have single-phase power, which supports a 7 kW charger, enough to fully charge most EVs overnight. Three-phase supply allows faster 22 kW-capable charging, but upgrading your supply is rarely worth the cost for home use. Glen will confirm what your home has and give you a straight recommendation.

Can't I just charge from a normal power point?

You can, but it's slow. A standard power point trickle-charges at a rate that can take more than a full day for a big battery, and it shouldn't share a circuit with other appliances for long charging sessions. A dedicated wall charger on its own protected circuit is faster and safer. If you do want extra outlets in the garage, see our power points and switches page.

Which EV charger brands do you install?

Glen will recommend a charger suited to your home and your driving during the assessment. We can also install a compatible charger you've purchased yourself, and Glen will confirm suitability before you commit.

How long does the installation take?

A straightforward install, with the charger near the switchboard and no board upgrade needed, is typically finished within a day. Longer cable runs or a switchboard upgrade add time, and Glen will give you the timing along with your fixed price so you can plan around it.

EV Charger Installation Across Joondalup & Perth's Northern Suburbs

Based in Joondalup

Local means minutes away, not the other side of Perth. If your suburb's within the northern corridor, you're in our patch.

0438 678 218

Ready to Charge at Home?

Get a straight answer on your switchboard and one fixed price for the whole job, from a licensed Joondalup sparky with 25+ years on the tools.

0438 678 218

Request a Free Quote

Your enquiry goes straight to Glen, not a call centre. Your details are only used to respond to this enquiry. Privacy Policy.

Call Now Get a Quote